This paper presents the development of the Danube, at the same time
the end showing that total energy potential of Danube 42,000 GWh/year is used
71,3 % (30,000 GWh/year), country, assigned as follows: 31.5 % Austria,
15.6 %, Romania, 15.6 %, Serbia, 6.3 % Slovakia and 2.3 % Germany
Cuvinte cheie: centrală hidroelectrică, turbină hidraulică, generator
Key words: hydroelectric power station, hydraulic turbine, generator