A LARGE RISE AND FALL FIXED FOR THE ROLLING
STOCK CLUJ-NAPOCA
In this paper are presented phases it went through a major
undertaking repair of rolling stock over time from 1870 to 2016 (period of 146
years).
Keywords: locomotive, wagon train, repair, transport
Cuvinte-cheie: locomotivă, vagon de tren, reparații, transport